The following list of road projects and maintenance resurfacing projects are currently planned. These projects are planned for unincorporated Larimer County and may result in traffic delays. The list of projects does not include work on state highways or city streets. Maintenance resurfacing projects include chipseals, slurry seals, grader patch and base stabilizations. All projects require moderate to good summer time weather and are subject to delays from weather and/or the availability of materials. Please be advised of the possibility that proposed work might not be completed in time or that additional projects could be added during the summer season. All projects are subject to change.

Flood 2013 road closure map  | Map of all County road closures

Flood response/repair road information: Progress to date | Work planned

Weather Related

Road number
Road name
From To Start date End date Contact Reason Type Expected delay
22H
CR 22H (Part 1)
US 34 9597 CR 22H 09/13/13
12:00 AM

LC R&B
970-498-5650
Restricted access to local traffic. September 2013 Flood. Reviewed 10/3/14 Restricted Access Only  
31D
CR 31D
CR 22H End 09/12/13
12:00 AM

LC R&B
970-498-5650
September 2013 Flood. Opening TBD, closed and signed. Those who proceed beyond the "Road Closed" sign do so at their own risk. Reviewed 10/2/14. Full Closure  
29
CR 29
approx. 1 mile north Hwy 34 approx. 2 miles SW of CR 27 09/12/13
12:00 AM

LC R&B
970-498-5650
September 2013 Flood. Opening TBD, closed and signed. Those who proceed beyond the "Road Closed" sign do so at their own risk. NO TRUCK TURNAROUND. Reviewed 10/2/14. Full Closure  
27
CR 27 (Buckhorn/Stove Praire Rd)
18000 Buckhorn Rd Ohana Way 09/12/13
12:00 AM
12/06/14
12:00 AM
Todd Juergens
970-498-5450
September 2013 Flood. EXTENSIVE DAMAGE. Closed and signed as such. NO TRUCK TURNAROUND. Construction has begun. Paving has been pushed back to the spring, road is expected to open with gravel surface in December. Newsletter: http://larimer.org/engineering/cr_27.pdf or Project sheet: http://www.larimer.org/engineering/projects/Stat9323.htm Full Closure  
22H
CR 22H (Part 2)
9597 CR 22H CR 29 09/12/13
12:00 AM

LC R&B
970-498-5650
September 2013 Flood. Opening yet TBD, closed and signed. Those who proceed beyond the "Road Closed" sign do so at their own risk. Reviewed 10/3/14. Full Closure  
59
CR 59
County Line End of County Maintenance 09/11/13
08:00 AM

LC R&B
970 498 5650
Permanent work yet to be done. Reviewed 10/2/14 Restricted Access Only  

Construction Related

Road number
Road name
From To Start date End date Contact Reason Type Expected delay
43
CR 43 (Devils Gulch)
US 34 (at Drake) Glen Haven 10/13/14
12:00 AM

Erich Purcell
970-498-5733
Construction started in October. Delays are posted on Thursdays for the upcoming week. Expect 60 minute delays. For Project Summary information: http://larimer.org/engineering/PROJECTS/Stat9386.htm, http://larimer.org/engineering/cr_43.pdf or visit http:www.lcr43.com for Delay schedule Delay 60 Minutes
70
Owl Canyon Road
CR 17 CR 19 08/25/14
12:00 AM
11/21/14
07:00 PM
Joe Temple
970-498-5717
Road closed for construction of Project No. 288. Full Closure Detour
Detour map
3
County Road 3
CR 20C CR 18 08/18/14
12:00 AM
12/26/14
06:00 PM
Marc A. Lyons
970-498-5709
Contractor will be hauling material from one area to another for two projects for the Town of Johnstown. The roadway is within the Town of Johnstown however Larimer County has one small section of CR 3 that we oversee and maintain. Full Closure Detour route will be in place.
Detour map
30
County Road 30
Approx. 500' East of County Road 11 Approx. 500' West of County Road 11C 08/11/14
12:00 AM
10/31/14
07:00 PM
Kyle Arend
970-498-5734
Construction of 2 modern traffic roundabouts at the intersections of County Road 11 and County Road 11C. Full Closure Detour
11
County Road 11
County Road 30 Approx. 500' North of Intersection 08/11/14
12:00 AM
11/17/14
07:00 PM
Kyle Arend
970-498-5734
Construction of a modern roundabout at the intersection of CR 30 and CR 11. Full Closure Detour
11C
County Road 11C
Approx. 500' South of CR 30 CR 30 08/11/14
12:00 AM
11/17/14
07:00 PM
Kyle Arend
970-498-5734
Construction of a modern roundabout at the intersection of CR 11C and CR 30. Full Closure Detour
44
Horsetooth Road
Ziegler (CR 9) Strauss Cabin (CR 7) 07/21/14
12:00 AM
11/28/14
07:00 PM
Marc A. Lyons
970-498-5709
Contractor (Connell Resources) is working for the City of Fort Collins to haul material from one side of the roadway to the other for one of City of Fort Collins projects. The roadway will be closed to traffic (pedestrians and bicycles too) during the day and open at night and weekends. The roadway will be close for 40 working days to haul the material. Please see attached map for detour route. Full Closure Detour route in place during closure