Dowdy Lake sunset
 
>Departments > Road and Bridge > Road Closures

Road Closures and Construction Delays

Subscription Service

Subscribe (or unsubscribe) and receive road closure notices in your email inbox. RSS

The following list of road projects and maintenance resurfacing projects are currently planned. These projects are planned for unincorporated Larimer County and may result in traffic delays. The list of projects does not include work on state highways or city streets. Maintenance resurfacing projects include chipseals, slurry seals, grader patch and base stabilizations. All projects require moderate to good summer time weather and are subject to delays from weather and/or the availability of materials. Please be advised of the possibility that proposed work might not be completed in time or that additional projects could be added during the summer season. All projects are subject to change.

Road closure map  | Map of all County road closures

Flood response/repair road information: Progress to date | Work planned

Weather Related

Road number
Road name
From To Start date End date Contact Reason Type Expected delay
2
CR 2
CR 21 CR 23E 06/04/15
12:00 AM

LC R&B
970-498-5650
This crossing has been damaged/destroyed during recent storm events. To schedule for replacement has been determined. Full Closure  
CR 3
CR 3
CR 18 CR 20C 05/20/15
12:00 AM

Larimer County Road and Bridge Department
970-498-5653
The Big Thompson River has over-topped CR 3. We will need to wait for the water levels to recede before we can assess damage and prosecute repairs. Full Closure  
29
CR 29
approx. 1 mile north Hwy 34 approx. 2 miles SW of CR 27 09/12/13
12:00 AM

Matt Johnson
970-498-5724
September 2013 Flood. Construction is anticipated to begin in late 2015 and be completed in mid 2016. The approach to both sides of the bridge is damaged. Road is closed at bridge and signed. Those who proceed beyond the "Road Closed" sign do so at their own risk. NO TRUCK TURNAROUND. Full Closure  
22H
CR 22H
9597 CR 22H CR 29 09/12/13
12:00 AM

Matt Johnson
970-498-5724
September 2013 Flood. Construction is anticipated to begin in late 2015 and be completed in mid 2016. Road is closed and signed. Those who proceed beyond the "Road Closed" sign do so at their own risk. Full Closure  
59
CR 59
County Line End of County Maintenance 09/11/13
08:00 AM

LC R&B
970 498 5650
Permanent work yet to be done. Restricted Access Only  

Seasonal/Emergency Closure

Road number
Road name
From To Start date End date Contact Reason Type Expected delay
86
Deadman Rd
Pearl Beaver Road CR 80C 10/30/14
12:00 AM
07/10/15
12:00 AM
LC R&B
970-498-5650
Seasonal Closure Full Closure  

Recently Opened

Road number
Road name
From To Start date End date Contact Reason Type Expected delay
27
CR 27 (Buckhorn/Stove Praire Rd)
18000 Buckhorn Rd Ohana Way 09/12/13
12:00 AM
12/24/14
12:00 AM
Matt Johnson
970-498-5724
Road is open with gravel surface as of December 24, 2014. Construction will continue throughout the winter and spring. The road will remain open with periodic delays. Paving will be in the spring. Newsletter: http://larimer.org/engineering/cr_27.pdf or Project sheet: http://www.larimer.org/engineering/projects/Stat9323.htm Open  

Construction Related

Road number
Road name
From To Start date End date Contact Reason Type Expected delay
18 E
8th ST SE
At intersection of HWY 287 (Lincoln Ave) At intersection of HWY 287 (Lincoln Ave) NEW:
07/07/15
12:00 AM
07/07/15
12:00 AM
Rick Johnson
970-498-5671
The intersection of 8th street SE and Lincoln Ave will be closed for asphalt repair on Monday July 7th. Traffic will need to inter from the East off of South Saint Louis Ave. Full Closure  
17
Shields Street
Willox Lane Hwy 287 07/06/15
12:00 AM
07/13/15
06:00 PM
Marc A. Lyons
970.498.5709
Shields Street will be reduced to one lane north of Willox Lane starting on July 6 for one week as the sewer project installs the final manhole of the North Shields Street Sanitary Sewer Extension Project. Commuters can expect delays and lane shifts but access to residents and businesses will be provided. Safety for commuters, residents, businesses and work crews is a priority. For more information, call 970-416-2558, email lchalfant@fcgov.com One Lane 5 TO 10 Minutes
17
Shields Street
Vine Drive Willox Lane 02/02/15
12:00 AM
08/24/15
07:00 PM
Erich Purcell
970498-5733
Larimer County is removing and replacing the existing bridge over the Pourde River and also reconstructing CR 17 (Shields Street from Vine Drive to Willox Lane. The Poudre River Bridge will be removed on Monday February 16, 2015. All businesses and residents south of the Poudre River will have access from Vine Drive. All businesses and residents north of the Poudre River will have access from Willox Lane. Please follow the detour routes. Full Closure Detour route in place during closure
Detour map
43
CR 43 (Devils Gulch)
US 34 (at Drake) Glen Haven 10/13/14
12:00 AM

Erich Purcell
970-498-5733
Work continues. Pilot cars will be leading vehicles 5 minutes after the hour.

Construction started in October, 2014. Delays are posted on Thursdays for the upcoming week. For Project Summary information: http://larimer.org/engineering/PROJECTS/Stat9386.htm, http://larimer.org/engineering/cr_43.pdf or visit http:www.lcr43.com for Delay schedule
Delay 1 Hour

Other Road Condition Sites

Background Image: Dowdy Lake Sunset by John Bartholow. All rights reserved.