Loveland Bike Trail
 
>Departments > Road and Bridge > Road Closures

Road Closures and Construction Delays

Subscription Service

Subscribe (or unsubscribe) and receive road closure notices in your email inbox. RSS

The following list of road projects and maintenance resurfacing projects are currently planned. These projects are planned for unincorporated Larimer County and may result in traffic delays. The list of projects does not include work on state highways or city streets. Maintenance resurfacing projects include chipseals, slurry seals, grader patch and base stabilizations. All projects require moderate to good summer time weather and are subject to delays from weather and/or the availability of materials. Please be advised of the possibility that proposed work might not be completed in time or that additional projects could be added during the summer season. All projects are subject to change.

Flood 2013 road closure map  | Map of all County road closures

Flood response/repair road information: Progress to date | Work planned

Weather Related

Road number
Road name
From To Start date End date Contact Reason Type Expected delay
27
CR 27 (Buckhorn/Stove Praire Rd)
18000 Buckhorn Rd Ohana Way 09/12/13
12:00 AM
12/23/14
12:00 AM
Todd Juergens
970-498-5750
September 2013 Flood. EXTENSIVE DAMAGE. Closed and signed as such. NO TRUCK TURNAROUND. Construction has begun. Road is expected to open with gravel surface in December, paving will be in the spring. Newsletter: http://larimer.org/engineering/cr_27.pdf or Project sheet: http://www.larimer.org/engineering/projects/Stat9323.htm Full Closure  
31D
CR 31D
CR 22H End 09/12/13
12:00 AM

LC R&B
970-498-5650
September 2013 Flood. Opening TBD, closed and signed. Those who proceed beyond the "Road Closed" sign do so at their own risk. Reviewed 10/2/14. Full Closure  
29
CR 29
approx. 1 mile north Hwy 34 approx. 2 miles SW of CR 27 09/12/13
12:00 AM

LC R&B
970-498-5650
September 2013 Flood. Opening TBD, closed and signed. Those who proceed beyond the "Road Closed" sign do so at their own risk. NO TRUCK TURNAROUND. Reviewed 10/2/14. Full Closure  
22H
CR 22H (Part 2)
9597 CR 22H CR 29 09/12/13
12:00 AM

LC R&B
970-498-5650
September 2013 Flood. Opening yet TBD, closed and signed. Those who proceed beyond the "Road Closed" sign do so at their own risk. Reviewed 10/3/14. Full Closure  
22H
CR 22H (Part 1)
US 34 9597 CR 22H 09/13/13
12:00 AM

LC R&B
970-498-5650
Restricted access to local traffic. September 2013 Flood. Reviewed 10/3/14 Restricted Access Only  
59
CR 59
County Line End of County Maintenance 09/11/13
08:00 AM

LC R&B
970 498 5650
Permanent work yet to be done. Reviewed 10/2/14 Restricted Access Only  

Seasonal/Emergency Closure

Road number
Road name
From To Start date End date Contact Reason Type Expected delay
44H
Pennock Pass
Gate past the Ranger Station CR 63E 12/05/14
12:00 AM
05/01/15
12:00 AM
Jim Frick
498-5663
Seasonal Closure Full Closure  
103
Laramie River Rd
SH 14 (at Chambers Lake) CR 99 11/24/14
12:00 AM
04/18/15
12:00 AM
Jim Frick
970-498-5663
Seasonal Closure Full Closure  

Construction Related

Road number
Road name
From To Start date End date Contact Reason Type Expected delay
17
Shields Street
Willox Lane Vine Drive NEW:
01/05/15
12:00 AM
03/20/15
12:00 AM
Lindsey Chalfant - COFC
970-221-6700
The City of Fort Collins Sanitary Sewer Department and Garney Construction will be installing a new Sanitary Sewer main in Shields Street from the Poudre River to Vine Drive during the time frame listed above. the roadway will be closed to all through traffic. Please use the detour that is set up around the construction zone. Full Closure Detour route in place during closure
Detour map
3
County Road 3
CR 20C CR 18 08/18/14
12:00 AM
02/20/15
06:00 PM
Marc A. Lyons
970-498-5709
Contractor will be hauling material from one area to another for two projects for the Town of Johnstown. The roadway is within the Town of Johnstown however Larimer County has one small section of CR 3 that we oversee and maintain. Full Closure Detour route will be in place.
Detour map
17
Shields Street
Vine Drive Willow Lane 12/01/14
12:00 AM
01/04/15
05:30 AM
Linsey R. Chalfant, PE
970.222.6089
City of Fort Collins Sanitary Sewer Department is placing new line across the Poudre River. Open 5 Min. for Trucks Turning into Roadway
13H
Jefferson Court
Jefferson Drive - Loveland End of Cul-de-sac 12/08/14
12:00 AM
12/24/14
05:00 PM
Marc A. Lyons
970.498.5709
The City of Loveland and their contractor BT Construction will be upgrading the waterline on this street along with Jefferson Drive. The roadway is closed to trough traffic however residents are allowed in. Full Closure Detour route set up on North Lincoln Ave and 41st
13H
Jefferson Drive
North Lincoln Ave - Loveland East 40th Street - Loveland 12/08/14
12:00 AM
12/24/14
05:00 PM
Marc A. Lyons
970.498.5709
The City of Loveland and their Contractor BT Construction will be upgrading the waterline on Jefferson Drive from East 40th Street to North Lincoln Ave. The roadway will be closed to through traffic. Residents are allowed in. Full Closure Detour route set up on North Lincoln Ave and 41st
US HWY 34
US HWY 34
Mountain Shadow Lane CR 43 NEW:
12/18/14
10:00 PM
12/19/14
04:00 AM
Joe Temple
970-498-5717
On December 18, 2014, Larimer County and its Contractor, Connell Resources Inc. will close US Highway 34, at 10:00 PM to install a concrete bridge girder as part of Project No. 9241 Big Thompson River Pedestrian Bridge. Installation of the bridge girder is expected to be complete, and the US highway reopened to traffic, on December 19, 2014 at 4:00 AM. Vehicles under 45 feet in length will be detoured onto CR 43. Vehicles longer than 45 feet will need to wait at the closure site during these hours or use US Highway 36 through Lyons, Colorado. This construction is weather and wind dependent. For further information please contact Joe Temple at Larimer County Engineering at (970) 498-5717, jtemple@larimer.org Full Closure 6 Hours
Detour map
13H
Monroe Ave
2nd Street - Loveland 4th Street - Loveland 11/05/14
12:00 AM
12/12/14
07:00 PM
Marc A. Lyons
970-498-5709
This closure is for the install of a new waterline along the west side of Monroe from 2nd Street to 4th Street. Detour route is set up. Full Closure Detour route in place during closure
Detour map
43
CR 43 (Devils Gulch)
US 34 (at Drake) Glen Haven 10/13/14
12:00 AM

Erich Purcell
970-498-5733
Construction started in October. Delays are posted on Thursdays for the upcoming week. Expect 60 minute delays. For Project Summary information: http://larimer.org/engineering/PROJECTS/Stat9386.htm, http://larimer.org/engineering/cr_43.pdf or visit http:www.lcr43.com for Delay schedule Delay 1 Hour