Flood 2013 Response/Repair Road Information

Progress to Date

Road number
Road name
From To Planned project end date Work accomplished to date Current road condition Closure type Last updated
22H
CR 22H (Part 1)
US 34 9597 CR 22H Minimal damage and debris from initial flood removed from road surface and right of way. All-weather surface Restricted Access Only 10/31/14 10:00 AM
22H
CR 22H (Part 2)
9597 CR 22H CR 29 Local access established to hard closure at 9597 CR 22H. Full Closure 10/31/14 10:01 AM
27
CR 27 (Buckhorn/Stove Praire Rd)
18000 Buckhorn Rd Ohana Way Work has begun on this section of road and is slated for opening in December. For Project Summary information: http://larimer.org/engineering/PROJECTS/Stat9323.htm or Newsletter: http://larimer.org/engineering/cr_27.pdf Full Closure 12/19/14 12:50 PM
29
CR 29
approx. 1 mile north Hwy 34 approx. 2 miles SW of CR 27 Design phase has begun. Other than initial assessment of damage, no work has been started on this section of road. Full Closure 10/31/14 10:00 AM
31D
CR 31D
CR 22H End Area around bridge was backfilled by contractor. Pioneered single lane Full Closure 10/02/14 1:07 PM
43
CR 43 (Devils Gulch)
US 34 (at Drake) Glen Haven Temporary repairs were completed in late 2013. The road is open full time (with expected delays) to general traffic and there are no travel restrictions in place. Project Summary information: http://larimer.org/engineering/PROJECTS/Stat9386.htm, http://larimer.org/engineering/cr_43.pdf or visit http:www.lcr43.com for Delay schedule Primitive two lane Delay 12/19/14 10:24 AM
47
CR 47 (Big Elk Meadows)
US 36 County Line Debris has been cleared, washouts repaired, road base hauled in and culverts installed. Road is now open to general traffic. Please use caution still. Primitive two lane Recently Opened 10/31/14 10:11 AM
59
CR 59
County Line End of County Maintenance Local Access established. Pioneered single lane Restricted Access Only 10/02/14 1:09 PM
63
CR 63 (Fish Creek Rd)
US 36 Saddleback Lane Fish Creek Road now has two lanes open all the way from Hwy 36 to Hwy 7. The road is open full time to general traffic and there are no travel restrictions in place. The bridge and road work in the area around Little Valley is nearly complete. The temporary alignment of Little Valley Road on private property has been removed. Primitive two lane Recently Opened 10/02/14 1:14 PM

Work Planned

Road number
Road name
From To Planned project start date Planned work Current road condition Closure type Last updated
22H
CR 22H (Part 1)
US 34 9597 CR 22H No repairs needed from initial flood on this section. All-weather surface Restricted Access Only 10/31/14 10:00 AM
22H
CR 22H (Part 2)
9597 CR 22H CR 29 Construction is in the design phase. Work is yet to be scheduled for this section of road. Local access has been established. There is road damage and the approach to the bridge over the Big Thompson River is damaged. Full Closure 10/31/14 10:01 AM
27
CR 27 (Buckhorn/Stove Praire Rd)
18000 Buckhorn Rd Ohana Way 0-15 days Work from 18000 Buckhorn Rd to Ohana Way began summer of 2014. This work will require significant design and repair work. This will be a hard closure for 2014. A determination has been made to NOT re-align the roadway out of the narrows. Design on the reconstruction of the roadway in much the same location as it was before is in process. Road is expected to open with gravel surface in December, paving will be in the spring. Newsletter: http://larimer.org/engineering/cr_27.pdf or Project sheet: http://www.larimer.org/engineering/projects/Stat9323.htm Full Closure 12/19/14 12:50 PM
29
CR 29
approx. 1 mile north Hwy 34 approx. 2 miles SW of CR 27 Construction is in the design phase. Bridge is still standing, road is washed out leading up to the bridge on both sides. Full Closure 10/31/14 10:00 AM
31D
CR 31D
CR 22H End Construction is in the design phase. Possible girder damage to bridge. Full Closure except very limited access. Pioneered single lane Full Closure 10/02/14 1:07 PM
43
CR 43 (Devils Gulch)
US 34 (at Drake) Glen Haven 0-15 days Permanent Repair work has begun. For more information, please visit Project Summary information: http://larimer.org/engineering/PROJECTS/Stat9386.htm, http://larimer.org/engineering/cr_43.pdf or visit http:www.lcr43.com for Delay schedule Primitive two lane Delay 12/19/14 10:24 AM
47
CR 47 (Big Elk Meadows)
US 36 County Line 0-15 days 12/13- Road now open to general traffic with no restrictions. Permanent work, phase 1 started fall of 2014. Permanent repair construction will begin summer of 2015. For permanent repair information please visit http://www.larimer.org/engineering/projects/Stat9332.htm or http://larimer.org/engineering/big_elk_meadows_update2.pdf Primitive two lane Recently Opened 10/31/14 10:11 AM
59
CR 59
County Line End of County Maintenance Repairs to first mile tentatively scheduled for Fall of 2014, could possibly be moved to 2015. Repairs to second mile of road still need to be determined. Pioneered single lane Restricted Access Only 10/02/14 1:09 PM
63
CR 63 (Fish Creek Rd)
US 36 Saddleback Lane 0-15 days Permanent work scheduled for Fall of 2015. For Project Summary information: http://larimer.org/engineering/PROJECTS/Stat9339.htm or http://fishcreekcorridorrepair.com/ Primitive two lane Recently Opened 10/02/14 1:14 PM