Dream Lake iced over - RMNP
closure

County Offices, Courts and Landfill will be closed on Monday, July 4 for the Independence Day Holiday. Critical services at Larimer County are not disrupted by closures.

 
> Departments > Engineering > Utilities

The review period for all permits may take up to 10 working days.

Right-of-Way Construction

Contact Person:   Scott Hamilton    498-5709    Send E-mail

Last Updated: June 6, 2016


Larimer County does not provide any utility services (water, electric, sewer, etc.) However, the Engineering Department regulates the installation of utilities within Larimer County Rights-Of-Way through a permitting process.


Right-of-Way Construction Permit Application


Insurance Requirements

General Provisions
(Chapter 1 - Larimer County Urban Area Street Standards)

Right-of-Way Construction Standards
(Chapter 12 - Larimer County Urban Area Street Standards)

Right-of-Way Construction Standards
(Chapter 12 - Larimer County Rural Area Road Standards)

Utility Emergency Contact Numbers

A Traffic Control Plan, developed by a certified traffic control company, must be submitted for all work performed within road rights-of-way, or that will directly affect the travelling public. Traffic Control Plan Approval Form [pdf, 21 Kb]


Permit Fees

Project Impact Surface Age Base Fee Additional Fee
Service Installation1
N/A
$100.00
N/A
Linear Footage Fee2
N/A
$100.00
$.10 per Linear Foot
Asphalt/Chipseal Cut
>12 Months Old
$200.00
N/A
Asphalt/Chipseal Cut3
< 12 Months Old
N/A
$5.00/Square Foot
Treated Gravel Cut4
N/A
$100.00
$100.00
Non-Treated Gravel Cut
N/A
$100.00
$ 50.00
Native Material Cut
N/A
$100.00
$ 50.00


1Service Installations which DO NOT disturb asphalt, concrete, or treated gravel surfaces, and DO NOT exceed a distance of ten (10) linear feet within the right-of-way will be assessed the Application Base Fee only.

2For installations parallel to the roadway within the right-of-way. This rate applies to underground installations only.

3Installations where the asphalt to be cut is less than 12 months old. If the Square Footage Fee is less than $200.00 then the $200.00 Asphalt/Chipseal Cut Fee will apply. Patches must be milled and inlayed to restore the roadway.

4For road cuts on gravel roadways that have been treated with Calcium Chloride, Magnesium Chloride, Lignin Sufonate, Exhesion, or other chemical dust suppressant within the last 12 months. This fee applies to all roads within public rights-of-way in Larimer County.

NOTE: These fees in no way release the applicant from restoring roadways to original or better condition. The street cut fees are in addition to the Base Application Fee and Linear Footage Fee. All fees are cumulative. Fees will not be charged for utility relocations due to capital improvements projects.




Color Code Chart

REMEMBER

CALL BEFORE YOU DIG!
1-800-922-1987
or 811

Utility Notification Center of Colorado


Background Image: Dream Lake frozen over in Rocky Mountain National Park by Bryce Bradford. All rights reserved.